Yacht Aditi

Planning for Christmas

We are finally working on deck and sorting out the garage in some late spring sunshine

DSC00989.JPGDSC00987.JPGDSC00978.JPG

 

 

 

 

 

 

 

 

 

 

And we are onboarding fuel conditioner for 20,000 litres of diesel, a large where’s-this-going tub of hydraulic oil, and Christmas decorations (we are allowing one box of Christmas bits and baubels)

 

 

 

 

 

And as part of the Christmas planning we are adding cockpit harness points with a 6 tonne / 15,000 lb working load which should hold a couple of crew with or without extra turkey (pictured with a swiftly made up nylon6 and 2mm 316 steel backing plate, however, after looking again at the depth of thread on the u-bolt the further addition of a marine ply backing plate has had to be included).

 

 

 

 

 

 

Leave a Reply